How do a Leading SOAR Platform Shipped Connectors 80% Faster by Removing Environment Setup Bottlenecks?

80%

Faster connector shipping

Up to 90%

Engineering hours shifted from setup to core building

5X

Faster environment access

Up to 95%

Of connector failures caught before production release
Customer

Leading SOAR Platform

Service Portfolio

ConnectX Lab

Customer Pain Points

Unique OEM environments for every integration
Delays in credential access
Manual environment configuration
Testing blocked by environment availability
Connector releases pushed back by weeks
Growing dependency on vendor access

How We Resolved Customer Pain Points?

On-Demand OEM Environments

Access 1,230+ OEM environments on demand without waiting for manual provisioning.

Faster Environment Access

Get test environments 5× faster, reducing environment-related delays.

Reduced Credential Dependency

Eliminate delays caused by waiting for vendor credential approvals.

Simplified Configuration

Reduce manual environment setup and move faster into connector validation.

Failures caught early

Testing in realistic environments caught up to 95% of failures before production release.

Release timelines back on track

Removing environment setup delays helped the SIEM platform to ship connectors 80% faster.